Construction

Full-cycle solution for industrial construction - "Build a house like a car"

Core pain points are solved
In view of the industry problems such as "long construction period, high pollution, high cost, and quality fluctuation" in traditional construction, relying on the technical accumulation of the first intelligent modular building production base in Hunan Province, we will build a full-process industrial construction system.


Unique solutions
Three-dimensional integrated industrial production system
With the "Golden Scale Cloud Manufacturing" digital management and control system as the core, it realizes the collaboration of "design standardization, intelligent production, and construction modularization". In the design stage, BIM fully parametric modeling is used to disassemble the building into standardized module units (such as dormitory modules and office modules) to adapt to different project needs. More than 90% of the production process is completed through intelligent welding robots, profile processing lines and other equipment, and the error is controlled at the millimeter level, which is 3 times higher than manual production efficiency. In the construction stage, the "all-dry node connection" technology is adopted, and only the module hoisting and pipeline docking need to be completed on site, and the assembly rate is more than 90% (such as the 25-day hardcover delivery of 398 modules in Xiangtan Baigongyi Apartment).


Cross-scenario structure adaptation technology
For different building types such as industrial plants, affordable housing, and park facilities, we provide three customized structural systems:
The permanent building adopts a built-in box and frame combination structure (such as the public rental housing for teachers of Hunan Agricultural University, and the 8-story building has been formally approved);
Multi-storey buildings adopt socket stacking structure (such as OKI dormitory in Indonesia, 3-story building has an earthquake resistance of 7 degrees);
The temporary building adopts a stacked box-packing belt structure to achieve rapid disassembly and reuse, and the component recovery rate exceeds 90%.


Full-cycle cost optimization scheme
Through the triple effect of "factory prefabrication reduces material waste by 30% + standardized production reduces labor costs by 40% + shortens construction period and saves financial costs by 20%", the total project cost is reduced by 50% compared with traditional buildings and more than 60% lower than the cost of containerized modular buildings. Typical case: Jingzhou prefabricated box house project, construction completed in 40 days and halved cost.


Core competitiveness
Build barriers with "state-owned enterprise guarantee + smart factory + full-chain control" to solve the construction standardization problems of cross-border and cross-climate zone projects, such as Indonesia projects adapted to high salt spray environments and Kyrgyzstan projects adapted to arid climates.